-The
frame opening must be level, plumb and square.
-The sill must
be level and provide support for the the door.
-Install a
sill pan or run non-hardening caulk in 3 separate beads under
the sill and along the bottom of the jamb legs.
-The unit should
be installed in a closed position. Nail or screw temporarily,
as position may need to be adjusted.
-There should
be a 1/8" gap between the operating door and the header.
Shim to achieve proper clearance.
-Place shims
behind jamb leg at top, bottom and each hinge. Shim at same locations,
behind strike jamb leg. Shim behind head jamb as needed.
-Nail or screw
through shims into wall supports.
-Insulate all
voids and caulk door unit on all exterior finish areas.
-Insulated
glass will scratch easily. Clean carefully. Warranty does not
cover scratches in glass due to cleaning. |